Schedule of Rates 2008
Public Works Department

Labour - Schedule of Rates 2008                          
Materials - Schedule of Rates 2008                        
Conveyance of Materials                                        
G.O.(Rt) No. 527/2008/PWD dt. 17/04/2008          
G.O.(Rt) No. 2927/2008/LSGD dt. 28/07/2008 

 Rates for Labour, and Hire charges

Sl. No
                                               Description
Unit
Rates effective
from 1.4.2008
1
Black smith
Each Per day
190
2
Blaster or Quarryman 
Do
155
3
Boat building maistry
Do
190
4
Boat builder
Do
190
5
Boatman
Do
130
6
Brick Moulder
Do
130
7
Cable jointer
Do
170
7a
Cable jointer mate
Do
130
8
Carpenter
Do
190
9
Caulker
Do
190
10
Cleaner
Do
155
11
Cleaner-Lift Irrigation
Do
130
12
Dighy man
Do
130
13
Driver jeep
Do
155
13a
Driver-Lorry/Tractor/Dumper/Tipper   driver 
Do
165
14
Driver -pile driver                        
Do
175
15
Driver-  Pump driver/Operator
Do
155
16
Electrician
Do
170
17
Ferryman
Do
155
18
Fitter
Do
175
19
Hammerman(For helping blasters)
Do
130
20
Jumper
Do
155
21
Laterite cutter
Do
155
22
Lineman
Do
155
23
Lineman Assistant
Do
140
24
Mason-Brick or laterite
Do
190
25
Mason-Rubble mason
Do
190
26
Mason -Stone mason or stone cutter
Do
190
27
Mazdoor-Man and woman
Do
140
28
Mazdoor-Special mazdoor for syrveying, thatching, white washing etc
Do
150
29
Mazdoor-Heavy load mazdoor or Khalasi, for handling iron materials
Do
155
30
Machanic-I
Do
205
31
Machanic-II
Do
190
32
Machine-cum-operator-Hot mix plant
Do
230
33
Modeller I
Do
155
34
Modeller II
Do
145
35
Operator-Heavy earth moving machinery
Do
230
36
Operator - Lift Irrigation operator
Do
155
37
Operator-Lock operator
Do
130
37a
Operator-Lift
Do
130
37b
Operator-Mixer/Compressor
Do
155
37c
Operator Paver finisher
Do
230
38
Painter
Do
155
39
Picottach man
Do
130
40
Plumber/Pipe fitter
Do
190
41
Sawyer
Do
175
42
Scavenger
Do
190
43
Syrang
Do
155
44
Tailor
Do
155
45
Tinker
Each Per day
155
46
Turner I
Do
175
47
Turner II
Do
155
48
Watcher-Channel watcher,Dam watcher, bund and regulator
Do
130
49
Watcher Lift irrigation watcher
Do
130
50
Welder -Gas welding
Do
190
50a 
Welder- Arch welding
Do
190
51
Well sinker-Ordinary
Do
155
52
Well sinker-Diver using diving set
Do
230
53
Well sinker-Diver without diving set
Do
190
54
Wireman
Do
170
55
Wireman- Assistant
Do
155
56
Wireman- Helper
Do
130
57
Wood cutter
Do
175
58
Moulder
Do
190
59
Tile paver
Do
190
60
Marble cutter
Do
205
61
Skilled Assistant (Engineering Degree Holder)
Do
300
62
Skilled Assistant (Diploma Holder)
Do
240
63
Skilled Assistant (I.T.I, I.T.C, etc,) 
Do
190
64
Hardware Technician (Computer)
Do
190
65
Motor winder
Do
190
66
Technician- Electronic machinery
Do
190
HIRE CHARGES
67
Country Boat I class with 2 boatmen (10 to 14 tonnage ) (excluding wages of Boatman)
Per day
540
68
Boat II class with 2 boatmen (5 to 9 tonnage)            ,, 
Do
420
69
Boat III class with 2 boatmen (1 to 4 tonnage)            ,,
Do
330
70
Bullock cart with pair of bulls and driver
Do
480
71
Bulls (pair) with driver for grinding mortar
Do
360
72
Bullock cart  hire inculding bullocks and driver
per km
15
73
Boat hire for the first 25 Kms
per tonne km
7
74
Boar hire  beyond  first 25 kms
Do
7
75
Hand cart hire 1 tonne capacity
per day
60
76
Hand cart hire 0.5 tonne capacity
Do
35
77
Motor  lorry 5 tonnes and above
per running km
22
78
Mini Lorry -Below 5 tonne
Do
15
79
Tipper 
Do
22

Note:-

1) For Hilly areas 15 % increase in the rates may be allowed.
2) For difficult areas , restricted working hours etc. up to a 50 % increase in labour can be allowed subject
    to approval by the next higher authority.
3) This labour rate is applicable for Vol.II (Electrical schedule).


Disclaimer: These details are provided only for information. The values should be compared with the published Schedule of Rates of PWD when used for official purposes. Even though all efforts have been made to avoid errors in this data, IKM/LSGD would not be responsible for any problems/ damages caused due to use of this data